Document Type
Poster
Date
9-1-2023
Description/Abstract
In developing oil and gas projects, constraints limit the production potential of the field’s hydrocarbons. They include lack of adequate surface facilities, low oil prices, and contractual restrictions. This study investigated Guide rate and Priority allocation options available in Eclipse software for conventional wells. It was found that Guide rate option generally exhibited better performance than the Priority option with oil production initiated from low producer wells
Disciplines
Education
Recommended Citation
Tugume, Wycliffe, "Production Allocation Under Uncertainties" (2023). International Programs. 250.
https://surface.syr.edu/eli/250
Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.