Author(s)/Creator(s)

Wycliffe TugumeFollow

Document Type

Poster

Date

9-1-2023

Description/Abstract

In developing oil and gas projects, constraints limit the production potential of the field’s hydrocarbons. They include lack of adequate surface facilities, low oil prices, and contractual restrictions. This study investigated Guide rate and Priority allocation options available in Eclipse software for conventional wells. It was found that Guide rate option generally exhibited better performance than the Priority option with oil production initiated from low producer wells

Disciplines

Education

Creative Commons License

Creative Commons Attribution 4.0 International License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Included in

Education Commons

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.